top of page

Turramurra Project

Project brief

Complete renovation of bathroom to work in with existing heritage style of home. Required sympathetic balance between modern building and old traditional methods


Key challenges

  • extensive liaison required between architect, client & builder

  • sensitive approach to build given the period of the rest of the home

  • high attention to detail

  • very particular craftsmanship given the quality of the materials

  • limited time-frame

WHAT

Bathroom renovation

WHERE

Turramurra

WHEN

Quarter 3

2019 

bottom of page